PROJECT  
 





WE DO TURNKEY CONTRACT,
ENGINEERING DESIGN, CONSULTING,
INSTALL AND COMMISSIONING,
RELATE TO BELOW PRODUCTS :-

 



RAW SUGAR PLANT
REFINED SUGAR PLANT
FOOD PROCESSING PLANT
CHEMICALS AND PETROCHEMICALS PLANT
WATER TREATMENT PLANT
WASTE WATER TREATMENT PLANT
POWER SUPPLY PLANT
REVERSE OSMOSIS PLANT
BOILER AND PROCESS HEATER
STEAM AND GAS TURBINE
GENERATOR
ABSORPTION CHILLER SYSTEM
FUEL AND ENERGY CONSERVATION


INSTALLATION BOILER 60 TONS/HR AT LUMPANG
SUGAR INDUSTRY IN 1993
   
 
INSTALLATION CONTINNUOUS VACUUM PAN 90 M3
PRANBURI SUGAR


 
INSTALLATION WATER TREATMENT PLANT
CAPACITY 100 M3/HR
AT SOUTH BANGKOK POWER PLANT (EGAT) 1993

INSTALLATION SUGAR JUICE CLARIFICATION CAPACITYDIS0 300 M3/HR AT BANPONG SUGAR GROUP 1991
     
 
INSTALLATION TURN KEY PROJECT REFINED SUGAR PLANT
500 TPD AT PT. BERMIS MADU SEJATI INDONESIA